At this time [redacted] company is currently and was backed up or set Work up out 3 Months we never signed for The letter Because we never got the letter. As far as re shimming the house we should be able to get it done in January 2016 but we will not provide additional engineering and no permit...
by the city is required, because no new work will be done. We will be lifting on the existing piles installed previously. I will call the customer ASAP to set up work for 2016. Thanks [redacted]
At this time [redacted] company is currently and was backed up or set Work up out 3 Months we never signed for The letter Because we never got the letter. As far as re shimming the house we should be able to get it done in January 2016 but we will not provide additional engineering and no permit...
by the city is required, because no new work will be done. We will be lifting on the existing piles installed previously. I will call the customer ASAP to set up work for 2016. Thanks [redacted]