Revdex.com, Mr [redacted] changed the fence proposal from the original signed contract agreement to a custom style of fence This required cutting over fence slats to a custom "Dog Ear" style Mr [redacted] tried to change the contracted agreement throughout the entire process What should have been a 7-day job took our crew almost weeks to complete, due majorily to, his constant complaint about just about everything from day one Initially, we had to tear down approximate eight foot sections, as, the fence slats were installed one inch off the ground, then, Mr [redacted] wanted them lower than one inch This was a nightmare of a job for us I explained to Mr***, and showed him his proposal and contract, outlining his agreed purchase There simply was no way to make this man happy and we took a pretty good financial hit, based on his constant change of game I sent employees out on several occasions to make a correct here or there I would say at least trips to make him, we thought, satisfied Please see our Home Advisor webpage for a better picture of our professionalism and ratings from our past clients http://www.homeadvisor.com/rated.S*Construction.15016630.html Thank You for your attention to this matter We have complete documentation to support this matterHis claim is completely unacceptable and unwarranted Mr [redacted] has harrassed me verbally and via email constantly(of which, I have documentation to support) I will take legal action if this unwarranted action continues He is simply way off base in the facts Mike S***, Owner cc: [redacted] , Attorney
Revdex.com, ? Mr [redacted] changed the fence proposal from the original signed contract agreement to a custom style of fence? This required cutting over fence slats to a custom "Dog Ear" style? Mr [redacted] tried to change the contracted agreement throughout the entire process? What should have been a 7-day job took our crew almost weeks to complete, due majorily to, his constant complaint about just about everything from day one Initially, we had to tear down approximate eight foot sections, as, the fence slats were installed one inch off the ground, then, Mr [redacted] wanted them lower than one inch? This was a nightmare of a job for us? I explained to Mr***, and showed him his proposal and contract, outlining his agreed purchase? There simply was no way to make this man happy and we took a pretty good financial hit, based on his constant change of game? I sent employees out on several occasions to make a correct here or there? I would say at least trips to make him, we thought, satisfied.? Please see our Home Advisor webpage for a better picture of our professionalism and ratings from our past clients? http://www.homeadvisor.com/rated.S*Construction.15016630.html ? Thank You for your attention to this matter? We have complete documentation to support this matterHis claim is completely unacceptable and unwarranted? Mr [redacted] has harrassed me verbally and via email constantly(of which, I have documentation to support) I will take legal action if this unwarranted action continues? He is simply way off base in the facts.? ? Mike S***, Owner ? cc: [redacted] , Attorney ? ? ? ? ?
Complaint: ***I am rejecting this response because:
I have estimates stating what needs to be replaced and repaired (I have several more appointments with contractors for more estimates)
I have had several sit down consultations with attorneys and showed them the contract, pictures (during and after the work was done), the estimates I have obtained, they all feel that I have a very strong case against MrS***
I feel that I am another victim added to the statistics of being taken advantage by a contractor
If MrS*** wants to take this to court, then that is what we will do.Sincerely,*** ***
Complaint: ***I am rejecting this response because:
I have estimates stating what needs to be replaced and repaired (I have several more appointments with contractors for more estimates)
I have had several sit down consultations with attorneys and showed them the contract, pictures (during and after the work was done), the estimates I have obtained, they all feel that I have a very strong case against MrS***
I feel that I am another victim added to the statistics of being taken advantage by a contractor
If MrS*** wants to take this to court, then that is what we will do.Sincerely,*** ***
Revdex.com,
?
Mr*** changed the fence proposal from the original signed contract agreement to a custom style of fence? This required cutting over fence slats to a custom "Dog Ear" style? Mr*** tried to change the contracted agreement throughout the entire process? What
should have been a 7-day job took our crew almost weeks to complete, due majorily to, his constant complaint about just about everything from day one
Initially, we had to tear down approximate eight foot sections, as, the fence slats were installed one inch off the ground, then, Mr*** wanted them lower than one inch? This was a nightmare of a job for us? I explained to Mr***, and showed him his proposal and contract, outlining his agreed purchase? There simply was no way to make this man happy and we took a pretty good financial hit, based on his constant change of game? I sent employees out on several occasions to make a correct here or there? I would say at least trips to make him, we thought, satisfied.?
Please see our Home Advisor webpage for a better picture of our professionalism and ratings from our past clients?
http://www.homeadvisor.com/rated.S*Construction.15016630.html
? Thank You for your attention to this matter? We have complete documentation to support this matterHis claim is completely unacceptable and unwarranted? Mr*** has harrassed me verbally and via email constantly(of which, I have documentation to support) I will take legal action if this unwarranted action continues? He is simply way off base in the facts.?
?
Mike S***, Owner ?
cc: *** ***, Attorney
?
?
?
?
?
Revdex.com,
Mr. [redacted] changed the fence proposal from the original signed contract agreement to a custom style of fence. This required cutting over 900 fence slats to a custom "Dog Ear" style. Mr. [redacted] tried to change the contracted agreement throughout the entire process. What...
should have been a 7-10 day job took our crew almost 3 weeks to complete, due majorily to, his constant complaint about just about everything from day one.
Initially, we had to tear down approximate 5 eight foot sections, as, the fence slats were installed one inch off the ground, then, Mr. [redacted] wanted them lower than one inch. This was a nightmare of a job for us. I explained to Mr. [redacted], and showed him his proposal and contract, outlining his agreed purchase. There simply was no way to make this man happy and we took a pretty good financial hit, based on his constant change of game. I sent employees out on several occasions to make a correct here or there. I would say at least 5 trips to make him, we thought, satisfied.
Please see our Home Advisor webpage for a better picture of our professionalism and ratings from our past clients.
http://www.homeadvisor.com/rated.S[redacted]Construction.15016630.html
Thank You for your attention to this matter. We have complete documentation to support this matter. His claim is completely unacceptable and unwarranted. Mr. [redacted] has harrassed me verbally and via email constantly. (of which, I have documentation to support) I will take legal action if this unwarranted action continues. He is simply way off base in the facts.
Mike S[redacted], Owner