1. Guido *** designrf two homes for me - *** - *** My move-date was June 11, 2015.
2. On Sept. 6, 2019, I e-mailed & called Mr. & notified him that 2 of his 3 California designed windows, where the windows are angled out away from the house, were now growing green & black mold around the window frame area, and outside of the adjacent portions of the house , b/c the rain water sits at the bottom of each window;
4. Mr. acknowledged his mistake said he was sorry, but he did not offer a remedy to his window design flaw; and
5. A 3rd party contractor quoted me 8K to repair (i.e., new wood, new paint, new frames, new hardy-board, new paint, labor to remove and re-install each window).
1. Guido *** designrf two homes for me - *** - *** My move-date was June 11, 2015.
2. On Sept. 6, 2019, I e-mailed & called Mr. & notified him that 2 of his 3 California designed windows, where the windows are angled out away from the house, were now growing green & black mold around the window frame area, and outside of the adjacent portions of the house , b/c the rain water sits at the bottom of each window;
4. Mr. acknowledged his mistake said he was sorry, but he did not offer a remedy to his window design flaw; and
5. A 3rd party contractor quoted me 8K to repair (i.e., new wood, new paint, new frames, new hardy-board, new paint, labor to remove and re-install each window).