Fiberless Abatement removed an asbestos floor in the church where I am pastor. The men were so polite and respectful, and the did a fabulous, safe removal. They have all kinds of safety equipment, received a permit in the time they said it would take, and completed the job exactly on time. I have been working with several companies for different things, and Fiberless Abatement has given me hope again that companies can be ethical, kind, and professional. Abatement is not something we need often, but when you do, this company is truly excellent.
Rev. Denise

Very unscrupulous. We were quoted $1800 for abatement. We knew it would be a little more since we needed to add a small part of a second wall. Our contractor had asked that the contract be sent to him, but he was told we needed to sign the waiver for the state. *** brought over the form - did not show us any page but the waiver and had us sign. When the job was done, we received an invoice for almost $5000. None of this was for the additional space - it was all things they had not told us about ahead of time. When questioned about this, they simply said we had signed the contract (which we never saw), and they would put a lien on our house. If I had known that, I would have taken them to small claims court. Might have lost, but they would at least be held responsible for deceptive practices. I cannot fault their work. They did a good job; however, the price was a total scam, and I would never recommend them.

Fiberless Abatement Response • May 21, 2020

We are deeply sorry that Mr. feels this way towards us. It is never our intention to deceive or take advantage of our customers. We are very upfront with them about everything and throughout the project we provide updates to keep our customers informed about their project. We never promise or provide verbal estimates to our customers. We always issue them an estimate or their contractor if they sub-contracted us, that way they can review every detail on the estimate as well as read the contract that is provided with it. For Mr. project we never verbally or on paper quoted him or his contractor that his project would be completed for $1,800. We quoted Mr. project at $4,686.07 which we sent the estimate through e-mail to Mr. contractor, as he sub-contracted us to complete the job. He viewed the estimate of $4,686.07 twice. Once on the 16th of March and again on the 17th of March at 07:56 am right before he paid the deposit for the project. One of the owners of the company went to Mr. residents and physically showed him the estimate of $4,686.07 on his phone to review right before he signed it. The 40 sq. Ft. section that Mr. is referring to his contractor asked us to remove after the estimate was signed. We told his contractor that we would add an extra $170.00 to the invoice and he was ok with that. That increased the invoice to $4,856.07. The wavier that Mr. is referring to is the Opt-out permit. The permit is required by Colorado state and federal law to begin an abatement project. It is also Colorado state law as well as a federal law that the homeowner/building owner is responsible, not the contractor that they hired for the asbestos in the residents/building. Therefore, it is required to have the owner sign, not the contractor, to receive an approved permit to begin any abatement project. This is what ***, one of the owners, brought to Mr. to explain and for him to review the permit. The opt-out permit has nothing to do with the estimate that his contractor-asked for and was provided with. As we said before he viewed the estimate of $4,686.07 twice. Once on March 16th at 11:08 pm and again on March 17th at 07:56 am. Since then his contractor knew that the original estimate was for $4,686.07 and NOT $1,800. When the job was completed, Mr. and his contractor both received the invoice of $4,981.07 but since his contractor paid the deposit of $937.21, the remaining balance was $4,043.86. This invoice included the additional 40 sq. Ft that was removed as well as the City permit fees of $125.00 that was also required to do the project. Mr. contractor was aware and agreed to pay for BOTH. This is the reason why the original estimate of $4,686.07, viewed twice by his contractor, was increased (additional space - $170.00 and City permit fees - $125.00) to $4,981.07. There is nothing that we have not said or explained to Mr. or his contractor to mislead them about the estimate or the invoice. All our estimates/invoices are broken down into sections and within each section we specify the service to be done along with the cost of that service, per unit, and the total amount of that service. We also include, in the scope of work, everything that is to be done on the project. After the scope of work, we have our contract and underneath that there is a place for them to sign the estimate. We send all our estimates through e-mail so that way the customer or contractor can review it whenever they like and bring to our attention any concerns that they have about the estimate. This also gives our customers the ability to download, print, save, and sign the estimate electronically and keep it for their records. Unfortunately, we never knew that Mr. had issues with us about the estimate/contract that he looked at and signed until now as we were dealing directly, per Mr., with his contractor. We have never been questioned about this issue from Mr. either from a phone call, e-mail, or text message. Instead after a week of silence from his contractor, after multiple attempts made by e-mail, phone and, text message we sent Mr. an e-mail and Mr. replied to us “This payment is coming from David our contractor.” He also replied to us “You guys have to settle it, as DAVID told us $1,800.” These were Mr. last e-mails to us. Right after Mr. e-mails, we finally heard from his contractor asking us for our W-9 so he could issue our check. We sent him our W-9 and the processing fees for paying with a credit card were removed since he told us that he was paying by check. The following day the contractor e-mailed us again saying “is there any room in your estimate to bring the cost down? When I signed and paid I THOUGHT we were around 1,800.00 I thought that my 900.00 was 50% of the project”, even though he viewed the estimate twice. On the same day we responded to him to let him know that sadly we could not make any new deal with Mr. contractor on a job that had already been completed a week before. We believe that we are not at fault for Mr. contractor’s failure to read the estimate completely even though he viewed it twice before he signed and paid the deposit. After this e-mail we did not hear from Mr. contractor acknowledging that we could not lower the price and that he would issue a check. After 3 days we still did not hear from Mr. contractor so we told him that if he refused to pay that we would, unfortunately, be forced to put a lien on Mr. house until he paid for the completed project. After this notice he responded to tell us that he issued a check and put it in the mail. TO THIS DAY WE STILL HAVE NOT RECEIVED HIS CHECK. Now we know how deceptive Mr. contractor was when he said that he sent the check in the mail but turned around and paid by credit card a few days later avoiding the processing fees. In the contractor's last e-mail, he told us that “I have debated making this difficult just to have fun.” We did not reply to this unprofessional and disturbing comment and we thought that this was over and done with. Finally, the price that we quoted Mr. contractor, we believe is reasonable and fair based on the market for asbestos abatement for the work that was done. We never deceive any of our customers and pride ourselves on being as professional as possible. We are incredibly surprised by Mr. comments as he was a joy to work with, he never raised any concerns with us about the estimate or the work that we did and after the job was completed we were paid directly from his contractor.Respectfully,Fiberless Abatement, INC

Customer Response • May 21, 2020

Complaint: ***

I am rejecting this response because:

We just needed to add that our contractor denies ever seeing an estimate for this amount, and we would love to see a copy of the emails sent to him and his acceptance of that estimate.

Sincerely

Fiberless Abatement Response • May 22, 2020

With the program that we use it provides us with an activity
log that tells us whenever an email is opened by our clients, when the estimate
or invoice is viewed by our clients, when our clients sign the estimate, and
also when they pay us electronically. To this day we cannot comprehend how Mr.
*** contractor who supposedly never saw our estimate and the total cost
of that estimate, can send us an e-mail asking for our help to lower the cost
because he thought that it was for a different price. With all due respect, we
believe that we should not be held liable if Mr. contractor did not
read the entirety of the estimate that we sent him. Lastly, we hope the documents
that we are sending will clear this up.Respectfully,Fiberless Abatement

Check fields!

Write a review of Fiberless Abatement

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by adding a photo

Fiberless Abatement Rating

Overall satisfaction rating

Address: 12470 York St. #1, Eastlake, Colorado, United States, 80614-0001

Phone:

Show more...

E-mails:

Sign in to see

Add contact information for Fiberless Abatement

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated