just let him know that there's nothing more to payI consider this a paid in full and like I said to you yesterday that note with specifically for my records
I have determined there is items missing, as the job was not finishedThere was supposed to have been lights run in the entire basement they were notThere was also no material left over from the job not even any electrical cableWithout the work that was done there should be materials left on site for me to finish this off.This electrician has also set up all future work to be way more difficult, all of the electrical lines that are run to the panel are not labelled, so instead of just reading a label and connecting them someone has to go through the entire house and check to make sure what line does what, this will easily add another 10-hours of work as a posed to minutes of labeling in the beginningI paid a premium for his services and had nothing but issues and poor workmanship from this electrician
just let him know that there's nothing more to payI consider this a paid in full and like I said to you yesterday that note with specifically for my records
I have determined there is items missing, as the job was not finishedThere was supposed to have been lights run in the entire basement they were notThere was also no material left over from the job not even any electrical cableWithout the work that was done there should be materials left on site for me to finish this off.This electrician has also set up all future work to be way more difficult, all of the electrical lines that are run to the panel are not labelled, so instead of just reading a label and connecting them someone has to go through the entire house and check to make sure what line does what, this will easily add another 10-hours of work as a posed to minutes of labeling in the beginningI paid a premium for his services and had nothing but issues and poor workmanship from this electrician