Review: Did not complete paver job, Promised several times to complete job and no show. not returning callsDesired Settlement: Just want them to complete job...$20,625.00 total contract. , completed driveway paving, pavers on driveway and stone gravel on side of garage.Need to supply and install 20'x5' walkway pavers to complete full job.
Business
Response:
We will complete said work in APPROX 30 Days from July 18 2014
Install pavers re-sidewalk
Im having a problem to match up pavers to old existing patio
I have no problem to get a different type of paver
sorry for the delay we will complete your work
Review: They gave us a quote for repaving our driveway
First they agreed to a price and signed a contract. They collected $500 in deposit.
Then they reneged on the contract and quoted a higher price (gave multiple reasons), at which point I wasnt interested in doing business with them.
They took more than a month to return my deposit, but once they did, their check issued to me bounces.
I just called the owner to inform them of this issue and they suggest I wait (and offer me no timeframe by which this will be rectified)Desired Settlement: Please refund my check of $500 ASAP.
Consumer
Response:
Review: [redacted]
I am rejecting this response because:
They have been in the "process" of returning my $500 for months. An exact date by which the check or cash will be received will be helpful.
Regards,
Business
Response:
We agree to return said deposit of $500.00 in APPROX 30 days from July 18 2014
Having some problems with cash flow at this time
Waiting to get paid from a customer
A very large paving job 30 day turn around for payment
Thank you
C&G Pavers & Concrete, LLC replaced my 35 year old driveway and did a very professional job. First, the concrete apron at the garage was replaced with 4000 psi concrete. A few days later the old driveway was completely removed down to the original base.
As the area has a high clay content they put down 6 inches of additional base of stones and crushed concrete and compacted the base with a roller and a flat plate compacter in tight places. Two days later they paved the driveway. First a 3 inch layer of stabilizing base course was applied, rolled and compacted to assure the drainage would meet my requirements. Then the final 3 inch layer of hot mix asphalt (F.A.B.C Design Mix 1 -5) as specified.